Systems engineering · Requirements · Verification

Can Automotive SPICE help with ship design?

Changing regulations. Data from multiple suppliers. A model with information still missing. Using ice-class rules as a case study, I explore how to connect requirements, design and verification evidence.

From scattered data to connected evidence

One ship, many connected pieces of information Three data sources are connected to a ship model. Compliance needs to be considered at the whole-system level.
Hull + propulsion + supplier data → one system
“Why are we only finding out about this now?”

In an engineering project, that question can mean a redesign, repeated analyses and a delayed deadline. It came to mind as I read the study by Haitham Al-Shami, Riku Ala-Laurinaho and Raine Viitala on the classification and semantic verification of regulatory requirements in ship design.[1]

One requirement. Multiple data sources.

Consider propulsion power for an ice-going ship. Assessing it requires information about hull geometry, the propeller, the propulsion configuration and the conditions associated with the selected ice class. Different teams and suppliers produce these data.

An engine parameter is therefore only part of the picture. We still need to establish whether the complete system meets the applicable requirement. When information is missing or a regulation changes, the team should know what has yet to be demonstrated and which data are needed.

Example: a propulsion power requirement
Hull geometryDimensions and calculation inputs
Propulsion dataEngine, propeller and configuration
Assessment conditionsIce class and applicable rules
Available power ≥ required power
A simplified expression of the criterion. The actual requirement must identify the applicable rule, conditions, inputs and calculation method.
THE STUDY’S METHOD

From a regulation to a model-based check

The authors propose encoding selected regulatory clauses as rules that can run against ship model data. A shared semantic model describes components, their relationships, values and units. RDF and OWL organise this information, while SHACL and SPARQL are used to define the checks.[1]

A result can then identify a specific parameter that violates a constraint or information that is still missing. For more demanding analyses, the model checks whether the required data are complete; an external tool performs the calculation or simulation.

  1. Regulatory clauseSource and applicability
  2. RequirementMeaning, criterion and method
  3. Model dataComponents, values and units
  4. Check and resultAssessment, missing data or further analysis
The rule remains connected to the requirement and the information used to assess it.

Five categories, different kinds of evidence

The study manually extracted and formalised 201 requirements from the Finnish-Swedish Ice Class Rules. The categories reflect how the requirements are checked. Expand each category to see the differences.

68Static

A direct comparison of a recorded value against a constraint or an allowed set, such as checking a parameter against a threshold.

61Static Calculation

A check of a value calculated from several parameters. Simple arithmetic and comparisons can be expressed in rules using SPARQL.

22Dynamic

Assessing behaviour over time requires simulation. The semantic layer checks that the necessary variables and relationships are present, while an external tool provides the analysis result.

12Complex

Advanced calculations exceed the capabilities adopted for the SHACL/SPARQL rules. The model checks whether the data are ready for calculations performed by an external solver.

38Physical Test

These requirements need a physical test or inspection. The model can store the verification status, but recording a status does not perform the test.

These categories describe the approach used in the study. Their boundaries also depend on the available verification methods and tools.

201formalised requirements
50reported as “passed” in the study
151remaining pending

These results concern the published sample ship data. The “passed” status also includes readiness checks for analyses of complex requirements. It does not establish full compliance of the entire ship. The remaining requirements await the relevant data or evidence.[1]

READINESS AND COMPLIANCE

Readiness for analysis is a separate stage

Suppose hull geometry is missing in our example. The team knows the power requirement but does not yet have all the data needed to assess it. This should trigger a specific action: identify who owns the missing information and agree how it will be supplied.

01 / Missing dataThe assessment cannot run yet

Identify the missing parameter and the responsible team.

02 / Complete dataThe analysis can run

Check the inputs, units and model relationships.

03 / Analysis resultCompare the result with the criterion

Confirm that the requirement is met or record a failure.

A successful data completeness check enables the analysis. The analysis result can then provide evidence that the requirement under consideration is met.
Missing information does not prove a design defect. It does mean that the relevant assessment cannot yet be closed.
AUTOMOTIVE SPICE

How can we organise the work around these checks?

This is where I see a role for Automotive SPICE practices. Automotive SPICE is a model for assessing development processes for software-based automotive systems. Selected practices can serve as a reference when organising requirements and evidence in another engineering context.[2]

The mapping to ship design below is my proposed adaptation. It starts with the problems described in the article and asks how a team could manage them.

SYS.1 / SYS.2
Requirements

Agreed meaning and acceptance criteria

These practices address eliciting, agreeing and analysing requirements. In our example, the team identifies the applicable ice-class rule, assessment conditions, required data and a measurable criterion for propulsion power.

SYS.2 / SYS.3 / SYS.5
Consistency and traceability

A path from the requirement to the result

Bidirectional traceability supports change impact analysis. For the propulsion system, I would link the requirement to design elements, the verification method and the result. If the propeller changes, these relationships help identify which assessments need review. Links alone do not demonstrate consistency of the content.

ACQ.4
Supplier coordination

Clear ownership of missing data

Supplier agreements cover information exchange and responsibilities. For the ship, I would agree the scope of hull and propulsion data, their format, units, delivery dates and review arrangements.

SYS.4 / SYS.5
Verification

Define the method and assessment conditions early

Verification practices cover verification measures, criteria and recorded results. For each rule, we select a calculation, simulation or test and specify which result will provide sufficient evidence.

SUP.8 / SUP.10
Configuration and changes

Control the scope of a change

Configuration control and change approval help maintain consistent versions. After a rule or component changes, we assess the impact on requirements, data, automated checks and results. We repeat the necessary assessments against an identified model version.

Process reference: Automotive SPICE 4.1. This adapts its principles to the case discussed here and requires consideration of the project context and applicable maritime rules.[2]

The V-model: plan the evidence with the requirement

The V-model helps explain the relationship between defining a system and checking it later. When writing the power requirement, we can already identify the data, tools and results needed to verify it. Verification checks against specifications; validation checks against needs and intended use.[3]

Simplified V-modelStakeholder needs correspond to validation, system requirements to system verification, and architecture to integration checks. Implementation and integration form the base. Stakeholder needsValidation System requirementsSystem verification ArchitectureIntegration checks Implementation / integration
  1. Stakeholder needs↔ Validation of intended use
  2. System requirements↔ System verification
  3. Architecture↔ Integration checks
  4. Implementation and integrationThe base of the model shown
An explanatory diagram. Automotive SPICE does not prescribe the V-model or a single sequence of processes; the organisation defines an appropriate project life cycle.[2]
IN PRACTICE

Where would I start?

I would choose a small, specific scope, such as propulsion power requirements for one ice class. A pilot like this lets us examine both the technical rules and the way teams work together.

  1. Identify the source and criterion.

    Assign a requirement ID. Record the source clause, its version, applicability, assessment conditions and acceptance criterion.

  2. Agree the inputs and responsibilities.

    Define the required parameters, units and data sources, and identify who will supply and review them.

  3. Separate readiness from the result.

    Keep data completeness distinct from the analysis result and the assessment of whether the requirement is met. Missing information should lead to a visible action.

  4. Check the rules against known cases.

    Prepare cases that meet the criterion, cases that fail it and cases with missing inputs. Have an expert review the results of automated checks.

  5. Trace a real change.

    Change a propeller parameter or the rule version. Check whether the team can identify the affected requirements, data and analyses, and reconstruct the basis of the previous result.

Connect the requirement to data, responsibility and evidence.

The article shows how regulatory rules can run against model data and reveal gaps in verification readiness. Automotive SPICE practices could help organise the work around those checks: agreeing requirements, coordinating suppliers, maintaining consistent information and controlling changes.

In my view, this connection is worth exploring in practice. We can assess its value by asking whether it becomes easier to find missing data, reconstruct the basis of a result and determine what needs to be verified again after a change.

Wanna know more? Let's dive in!

The G-Force of Growth

Artificial Intelligence (AI) is reshaping industries, but its success depends on more than just advanced algorithms. Without structured processes, AI systems risk being unreliable, biased, or unsafe. We explore the MMSIA framework, a new AI maturity model based on...