The Version Control Illusion: Why SharePoint Folders Fail Complex Systems and How to Master ASPICE Configuration Management and ISO 10007
GOOD: Standard ISO 9001 document and documented information control.
BETTER: Mastering ASPICE SUP.8 Configuration Management and ISO 10007 Configuration Management guidelines.
The files are approved.
Do they belong together?
The firmware has a release number. The drawing has a signature. The test specification is in the right folder.
That still leaves a practical question: are these the versions intended for the product you are about to build, test or deliver?
Configuration management connects those records to a defined product configuration and keeps track of what changes.
A version history answers one question.
What changed in this item? A product baseline adds another: which identified items belong together, for what purpose?
A team can approve firmware 1.2 and board revision B separately, while a technician still has board A on the bench. If firmware 1.2 depends on circuitry added in B, the two approvals do not establish that the bench setup is suitable.
The problem is the missing connection between the intended combination, its evidence and the actual unit.
Keep the distinction fair.
SharePoint supports version history and approval controls. ISO 9001 documented information is not restricted to static administrative documents.
A folder-based implementation becomes inadequate when it leaves product relationships, configuration status or build records unmanaged. The platform’s name alone does not tell you how well those controls work.
“Latest” is not a product configuration.
Select a reference baseline, then change the recorded items on the bench. The comparison separates a baseline match, a known alternative and an unrecorded combination.
Reference scope: controlled bench integration. This record does not authorise customer delivery.
The board and test definition differ from BL-GW-02. Review the intended combination before proceeding.
This comparison checks sample identity records. It does not test hardware, evaluate every dependency or approve a release.
A matching list is a starting point. You still need suitable checks, relevant results, known issues and the right authorisation for the next use. A checksum can help identify an exact binary; it cannot establish that the binary behaves correctly.
Record enough to find the same combination again.
A baseline identifies a defined configuration at a point in time. Its purpose and required item statuses should be clear. A prototype baseline may carry known issues; it should not be mistaken for a production release.
A configuration item (CI) is an item or group you control as a unit: a software build, a board definition, an assembly or a set of test assets. Choose a level that makes changes, identity and responsibility manageable.
Purpose, scope and authority
Name the baseline and say what it applies to: product variant, intended activity, relevant serial or lot range, exclusions and decision status.
Useful question: is this the configuration for a bench trial, a particular test or a customer delivery?
Exact items and stable references
Record the applicable part and assembly revisions, software build, calibration set, requirements and test definitions. Include build inputs and tools when they are needed to reproduce or understand the result.
Useful question: can someone retrieve the identified items without relying on a file named “latest”?
Evidence, exceptions and change history
Connect the configuration to its results, open issues, decisions and approved changes. State what the evidence covers and whether earlier results remain applicable.
Useful question: which claims are supported on this combination, and which still need work?
Availability, access and recovery
Keep released records retrievable and protect them from unintended alteration. Check that backup and recovery arrangements cover the items needed by the project.
Useful question: could another team recover an earlier baseline and understand its recorded state?
Follow the connections you have recorded.
Choose a sample change, then inspect the affected work. These are declared example relationships; a graph can only help with dependencies that people have identified and maintained.
A firmware update depends on board revision B.
Firmware 1.2 uses an input circuit introduced on board B. Review the existing units, build route and checks before deciding where the update may be used.
Identify the boards that are actually present.
Record which serials or lots contain board A or B. An approved drawing for B does not identify the board already fitted in a unit.
What record links each affected unit to its assembled board revision?
An authorised change still needs correct implementation and confirmation. If a dependency is unknown, record the uncertainty and investigate it. Automation does not supply missing engineering knowledge.
Check the behaviour. Check the identity.
Functional configuration audits (FCA) and physical configuration audits (PCA) examine these different questions. Tailor their scope, timing and records to the product and applicable arrangements.
What evidence supports the required behaviour?
Examine the relevant test, analysis or inspection records. Check their requirements coverage, configuration, conditions, results and unresolved findings.
A passing report for board A and firmware 1.1 does not establish performance on board B and firmware 1.2.
Keep these configurations distinguishable.
- As designed
- The intended product definition and revisions.
- As built
- Parts, software and parameters recorded on the assembled unit.
- As tested
- The exact setup covered by the recorded results.
- As delivered
- The configuration supplied, including any authorised changes.
They may differ for a valid reason. Record the difference and its disposition so a reviewer can judge whether the evidence and decision still apply.
Put controls around the product, not just the folder.
- ASPICE SUP.8
- Identify relevant items, control their revisions, establish baselines, communicate status, check consistency and verify backup and recovery arrangements.
- ASPICE SUP.10
- Manage change requests, impact assessment, authorisation, affected work and confirmation of implementation. A change board is one possible mechanism.
- ISO 10007:2017
- Use configuration management guidance across the product lifecycle. Adapt responsibilities, identification, change control, status records and auditing to the project.
These references do not prescribe a single repository, semantic versioning scheme or universal 24-month programme. Agree the controls and tools that fit the work and applicable requirements.
Start with one product and one change.
Before buying a platform or redesigning every workflow, check whether your current records can answer the questions below.
Name one real unit or build.
Choose a unit, variant and intended use. Establish which baseline applies and who owns the record. Include software, hardware, calibration and relevant evidence.
Compare the record with the unit.
Read the installed or assembled identities using appropriate records and checks. Record gaps or discrepancies. Do not infer the actual configuration from the newest drawing in a folder.
Follow one controlled change.
Ask the affected teams to assess the impact. Record the authority, intended scope, implementation evidence and how the change reaches test and manufacturing records.
Recover an earlier baseline.
Check that the required items remain available and that recovery arrangements work. Record what is missing, including build instructions or tool information needed to use them.
Conclusion: Moving from Paper Control to Item-Level Certainty
Controlling documents is an essential foundational requirement of any quality management system, but treating files in a shared folder as your primary engineering control mechanism leaves complex products vulnerable to severe integration failures.
By shifting your focus from static document control to ASPICE SUP.8 Configuration Management and ISO 10007 guidelines, you gain complete command over your product’s configuration items. You eliminate mismatched revisions, automate cross-domain impact analysis, and ensure that every software build, electronic schematic, and mechanical assembly lines up perfectly on the production floor.
Wanna know more? Let's dive in!
Traditional IT deployment models fail with AI
AI adoption · Data readiness Before launching AI, audit your data A working model does not tell you whether your organisation’s data is ready for it. Using a building-energy example, examine accuracy, privacy, accessibility and bias before a pilot, then turn the...
Organizational Readiness for AI Adoption Based on the TOE Framework
AI adoption · Organizational readiness How to apply TOE when adopting AI A convincing artificial intelligence demonstration can still leave a factory unprepared for production. Use Technology–Organization–Environment to turn an inspection idea into evidence,...
Organizational AI Readiness
Organizational AI Readiness · Research into practice Is Your Organization Ready to Implement AI? A convincing artificial intelligence (AI) demo is a start. Putting it to work also depends on people, processes, resources and usable data. An interview study offers a way...
A ship must meet ice-class rules.
Systems engineering · Requirements · Verification Can Automotive SPICE help with ship design? Changing regulations. Data from multiple suppliers. A model with information still missing. Using ice-class rules as a case study, I explore how to connect requirements,...
Beyond the Laminated Poster: Why Quality Policies Fail
GOOD: Maintaining a basic ISO 9001 Quality Policy. BETTER: Building a resilient, high-accountability Quality Culture using ISO 10010 guidance.A documented Quality Policy is a necessary administrative milestone, but a piece of paper cannot stop a defective component...
Why Meeting Basic ISO 9001 Isn’t Enough
GOOD: Meeting basic ISO 9001 compliance requirements BETTER: Integrating core quality tools guided by ISO 10009 guidelines for quality tools and their selection.An ISO 9001 certificate proves that an organization has structured processes in place, but it does not...
Beyond the Checklist: How to Integrate the V-Model, ASPICE SUP.1, and ISO 10006
GOOD: High-level PRINCE2 project quality management. BETTER: Engineering rigor via the V-Model lifecycle, ASPICE SUP.1 Quality Assurance, and ISO 10006 quality management in projects.High-level project management frameworks like PRINCE2 provide essential...
The Static Document Fallacy
GOOD: Eelying on static project scope documents, product drawings, and service specs. BETTER: Deploying a proper Requirements Management System with bidirectional traceability and a Quality Plan fully consistent with ISO 10005.Product drawings, scope sheets, and...
The NPS Mirage: Why Annual Surveys Miss the Mark
GOOD: Measuring satisfaction through periodic surveys and static NPS scores. BETTER: Building a dynamic, ongoing system to capture 100% of unstructured written and verbal customer feedback across all employee touchpoints.Relying on annual NPS surveys to gauge customer...
Why Global Innovation Fails in Multi-Plant Manufacturing And How to Build an Automated, ROI-Driven Transfer Matrix
GOOD: Sharing best practices across the corporation’s various facilities (Best Practice Sharing). BETTER: A global matrix for transferring process innovations, with automated tracking of savings (Kaizen/Six Sigma ROI) at the corporate level.Sharing best practices on...
Why Documenting Risk Actions Is Not Enough And How to Automate Mitigation Tracking with KPIs and KRIs
GOOD: Documenting risk-mitigation activities. BETTER: Automatically tracking the effectiveness of implemented mitigation measures using KPIs and KRIs (Key Risk Indicators).Documenting risk mitigation actions is an essential starting point, but treating documentation...
Moving Beyond Tech Risk Audits to AI Ethics, Legal Compliance, and Machine Learning Accountability
GOOD: Risk assessment for the implementation of new technologies (e.g., AI, IoT). BETTER: Ethical and legal risk assessment (AI Ethics & Compliance) when deploying machine learning models within quality-related decision-making processes.Deploying Machine Learning...