The Version Control Illusion: Why SharePoint Folders Fail Complex Systems and How to Master ASPICE Configuration Management and ISO 10007

GOOD: Standard ISO 9001 document and documented information control.

BETTER: Mastering ASPICE SUP.8 Configuration Management and ISO 10007 Configuration Management guidelines.

Configuration management · ASPICE SUP.8 · ISO 10007

The files are approved.
Do they belong together?

The firmware has a release number. The drawing has a signature. The test specification is in the right folder.

That still leaves a practical question: are these the versions intended for the product you are about to build, test or deliver?

Configuration management connects those records to a defined product configuration and keeps track of what changes.

From separate versions to one recorded combination
Controlled itemsProduct baseline
A folder can hold the right files without showing which revisions belong in this particular build.
File history is useful. Product identity needs more.

A version history answers one question.

What changed in this item? A product baseline adds another: which identified items belong together, for what purpose?

A team can approve firmware 1.2 and board revision B separately, while a technician still has board A on the bench. If firmware 1.2 depends on circuitry added in B, the two approvals do not establish that the bench setup is suitable.

The problem is the missing connection between the intended combination, its evidence and the actual unit.

Keep the distinction fair.

SharePoint supports version history and approval controls. ISO 9001 documented information is not restricted to static administrative documents.

A folder-based implementation becomes inadequate when it leaves product relationships, configuration status or build records unmanaged. The platform’s name alone does not tell you how well those controls work.

Item historyWhich version of this item?
Baseline recordWhich combination is intended?
Actual unitWhat was built or installed?
Explore a sample gateway configuration

“Latest” is not a product configuration.

Select a reference baseline, then change the recorded items on the bench. The comparison separates a baseline match, a known alternative and an unrecorded combination.

BL-GW-02 · Updated bench setup

Reference scope: controlled bench integration. This record does not authorise customer delivery.

Sample records
Reference: Board B× Differs from reference
Reference: Firmware 1.2✓ Matches reference
Reference: Calibration B✓ Matches reference
Reference: Test definition 03× Differs from reference
The branches follow the four selected items. Colour and symbols show their identity comparison with the reference baseline.
The recorded items do not match the reference.

The board and test definition differ from BL-GW-02. Review the intended combination before proceeding.

This comparison checks sample identity records. It does not test hardware, evaluate every dependency or approve a release.

A matching list is a starting point. You still need suitable checks, relevant results, known issues and the right authorisation for the next use. A checksum can help identify an exact binary; it cannot establish that the binary behaves correctly.

Make the baseline usable

Record enough to find the same combination again.

A baseline identifies a defined configuration at a point in time. Its purpose and required item statuses should be clear. A prototype baseline may carry known issues; it should not be mistaken for a production release.

A configuration item (CI) is an item or group you control as a unit: a software build, a board definition, an assembly or a set of test assets. Choose a level that makes changes, identity and responsibility manageable.

What belongs in the record?Open each part to see the question it should answer.
Purpose, scope and authority

Name the baseline and say what it applies to: product variant, intended activity, relevant serial or lot range, exclusions and decision status.

Useful question: is this the configuration for a bench trial, a particular test or a customer delivery?

Exact items and stable references

Record the applicable part and assembly revisions, software build, calibration set, requirements and test definitions. Include build inputs and tools when they are needed to reproduce or understand the result.

Useful question: can someone retrieve the identified items without relying on a file named “latest”?

Evidence, exceptions and change history

Connect the configuration to its results, open issues, decisions and approved changes. State what the evidence covers and whether earlier results remain applicable.

Useful question: which claims are supported on this combination, and which still need work?

Availability, access and recovery

Keep released records retrievable and protect them from unintended alteration. Check that backup and recovery arrangements cover the items needed by the project.

Useful question: could another team recover an earlier baseline and understand its recorded state?

A change rarely stops at one file

Follow the connections you have recorded.

Choose a sample change, then inspect the affected work. These are declared example relationships; a graph can only help with dependencies that people have identified and maintained.

CR-042 · Proposed change

A firmware update depends on board revision B.

Firmware 1.2 uses an input circuit introduced on board B. Review the existing units, build route and checks before deciding where the update may be used.

One proposed change can affect the product, software, evidence and the manufacturing handover.
Hardware & manufacturing

Identify the boards that are actually present.

Record which serials or lots contain board A or B. An approved drawing for B does not identify the board already fitted in a unit.

What record links each affected unit to its assembled board revision?

ProposeAssess impactAuthoriseImplement & confirm

An authorised change still needs correct implementation and confirmation. If a dependency is unknown, record the uncertainty and investigate it. Automation does not supply missing engineering knowledge.

Configuration verification and auditing

Check the behaviour. Check the identity.

Functional configuration audits (FCA) and physical configuration audits (PCA) examine these different questions. Tailor their scope, timing and records to the product and applicable arrangements.

Functional evidence needs to refer to the requirements, conditions and configuration that were actually checked.

What evidence supports the required behaviour?

Examine the relevant test, analysis or inspection records. Check their requirements coverage, configuration, conditions, results and unresolved findings.

A passing report for board A and firmware 1.1 does not establish performance on board B and firmware 1.2.

Keep these configurations distinguishable.

As designed
The intended product definition and revisions.
As built
Parts, software and parameters recorded on the assembled unit.
As tested
The exact setup covered by the recorded results.
As delivered
The configuration supplied, including any authorised changes.

They may differ for a valid reason. Record the difference and its disposition so a reviewer can judge whether the evidence and decision still apply.

Use each reference for the right work

Put controls around the product, not just the folder.

ASPICE SUP.8
Identify relevant items, control their revisions, establish baselines, communicate status, check consistency and verify backup and recovery arrangements.
ASPICE SUP.10
Manage change requests, impact assessment, authorisation, affected work and confirmation of implementation. A change board is one possible mechanism.
ISO 10007:2017
Use configuration management guidance across the product lifecycle. Adapt responsibilities, identification, change control, status records and auditing to the project.

These references do not prescribe a single repository, semantic versioning scheme or universal 24-month programme. Agree the controls and tools that fit the work and applicable requirements.

A small test of the process

Start with one product and one change.

Before buying a platform or redesigning every workflow, check whether your current records can answer the questions below.

Find it. Compare it. Change it. Recover it.
Name one real unit or build.

Choose a unit, variant and intended use. Establish which baseline applies and who owns the record. Include software, hardware, calibration and relevant evidence.

Compare the record with the unit.

Read the installed or assembled identities using appropriate records and checks. Record gaps or discrepancies. Do not infer the actual configuration from the newest drawing in a folder.

Follow one controlled change.

Ask the affected teams to assess the impact. Record the authority, intended scope, implementation evidence and how the change reaches test and manufacturing records.

Recover an earlier baseline.

Check that the required items remain available and that recovery arrangements work. Record what is missing, including build instructions or tool information needed to use them.

Make the product traceable

Know which combination you are working with.

Keep the version history and approval records. Connect them to the product baseline, the actual unit, the relevant evidence and the decisions about changes.

That gives engineering, test and manufacturing a record they can work from and a way to investigate when the product and the record disagree.

Could another team identify and recover the same configuration from your records?

Conclusion: Moving from Paper Control to Item-Level Certainty

Controlling documents is an essential foundational requirement of any quality management system, but treating files in a shared folder as your primary engineering control mechanism leaves complex products vulnerable to severe integration failures.

By shifting your focus from static document control to ASPICE SUP.8 Configuration Management and ISO 10007 guidelines, you gain complete command over your product’s configuration items. You eliminate mismatched revisions, automate cross-domain impact analysis, and ensure that every software build, electronic schematic, and mechanical assembly lines up perfectly on the production floor.

Wanna know more? Let's dive in!

North East England 2024

North East England 2024

Duration: 2 weeks Cities: Durham, Beamish Miles Travelled: 200Traveling to North East England offers a unique blend of history, culture, and character that stays with you long after you leave. One of the highlights is the enchanting city of Durham. Its cobbled streets...

Japan 2019

Japan 2019

Duration: 2 weeks Cities: Osaka, Tokyo, Hiroshima, Kyoto Miles Travelled: 9,000Japan in spring is pure magic. Spring felt like a moment suspended in time. The cherry blossoms were at their peak, casting a soft pink glow over temple roofs and narrow cobblestone lanes....

The Future of Lean and Six Sigma

The Future of Lean and Six Sigma

[dsm_gradient_text gradient_text="The Future of Lean and Six Sigma: How ISO 18404 is Shaping the Industry" _builder_version="4.27.0" _module_preset="default" header_font="Questrial|||on|||||" header_text_align="center" header_letter_spacing="5px"...