AI adoption · Organizational readiness
How to apply TOE when adopting AI
A convincing artificial intelligence demonstration can still leave a factory unprepared for production. Use Technology–Organization–Environment to turn an inspection idea into evidence, responsibilities and a controlled pilot.
The factory needs more than a working demo
Consider the same illustrative factory as the video: camera-based AI helps inspectors find cracks in metal parts. Engineering integrates the system, quality defines defect and acceptance criteria, operators use the results, and a supplier maintains the model. The intended benefit is faster inspection, with people retaining release decisions.
The demonstration may use clear images and familiar defects. Production adds changing lighting, different shifts and rare cracks. An image collection can be complete against a collection plan yet still omit an important operating condition. Available data therefore needs a suitability check before it becomes credible test evidence.
Responsibility creates another failure mechanism. If the AI and inspector disagree, who verifies the reference decision, contains the issue and authorizes continued use? A model purchase cannot settle those questions. Neither can good test results compensate for an undefined response.
Read the study as a map of readiness
Hirtranusi and colleagues report a systematic review of 40 journal articles. They used open, axial and selective coding: extract readiness statements, group related concepts, then consolidate broader themes. Their synthesis identifies 12 themes, four within each TOE dimension. [1]
The contribution is a structured account of interacting conditions. Data and infrastructure depend on organizational resources and governance; supplier and institutional conditions shape what the organization can sustain. The authors propose this synthesis as a foundation for future readiness assessments. They do not validate a universal scoring instrument or test our factory workflow.
What do the coding counts and limitations mean?
The reported 124 initial codes include four meta-level codes excluded from readiness classification. The remaining 120 TOE codes were consolidated into 35 categories and 12 themes. These are synthesis units, not success rates.
The review covers English-language Scopus journal literature with heterogeneous readiness definitions. It does not establish post-adoption value. Included-study years and filtering stages are described inconsistently, so those details should not support precise trend claims. Its cross-dimensional relationships are a conceptual synthesis, not causal effects measured in a new experiment.
Turn TOE into evidence and ownership
The Technology–Organization–Environment framework, attributed to Tornatzky and Fleischer (1990), examines three adoption contexts. Environment means external business and institutional conditions. Its three contexts guide the proposed inspection pilot below; the workflow is an application of TOE, rather than an official process sequence. [2]
Ask what must be true in each context, what evidence would demonstrate it, and who owns the gap. Open each perspective to examine the practical action.
TechnologyCan we trust the test and the connection?
Quality verifies defect labels; engineering tests production images held out from training. Include rare defects, lighting changes and the intended operating range. Keep duplicate images out of the final test, and avoid repeatedly tuning against it. [5]
Check that each result reaches the correct part record in time. Evidence includes a versioned dataset, reference-label review and integration results. This applies the paper’s Data & Analytics Readiness and System Capability themes.
OrganizationWho owns a disagreement?
Quality names an accountable inspection owner. The sponsor allocates testing and training time. Operators practise escalation and record both the AI suggestion and the verified inspection outcome.
Evidence includes the decision rule, training records and an exercised response to disagreements. This applies Strategic & Managerial Support, Human & Structural Readiness, and Cultural & Governance Alignment. Human release authority remains explicit.
EnvironmentWhich external conditions must hold?
The project manager confirms supplier support, model-version information and advance update notices. Quality agrees customer acceptance requirements and identifies applicable obligations with the responsible specialists.
Evidence includes support arrangements, change notices and agreed criteria. This applies Collaborative Ecosystem and Regulatory & Policy Context. Receiving a supplier document alone does not demonstrate that its requirements have been met.
Connect the checks before deciding to scale
The contexts meet in one supervised pilot. A trained operator needs useful model output; a trustworthy comparison needs verified reference inspections; and a model update needs an agreed review route. This proposed loop makes those dependencies visible.
Measure behaviour, not checklist completion
Compare model classifications with reference inspections whose disagreements have been resolved. Track missed defects, false rejects and inspection time against criteria agreed before testing. Here, a “false reject” means an acceptable part flagged by AI; an inspector may still release it. These counts do not directly measure escaped defects or actual scrap.
Use the correct denominator: missed defective parts divided by reference-defective parts; falsely flagged acceptable parts divided by reference-acceptable parts. Overall accuracy uses all classified parts. [4]
Try the inspection example
What does a high accuracy figure hide?
These invented counts illustrate the measures. They are not study results or a readiness score.
With 20 defective parts, two misses, 1,000 acceptable parts and ten false flags: missed-defect rate is 10.0%, false-reject rate is 1.0%, and overall accuracy is 98.8%.
Change the whole-number counts. All reference labels are assumed verified.
The illustration misses 2 of 20 defective parts despite 98.8% overall accuracy.
A sample with no defective parts cannot estimate the missed-defect rate. Even an observed zero needs adequate coverage and uncertainty assessment before a deployment decision.
Start with one part family on one line
Define the pilot boundary, operating conditions, model version and human release authority. Record each TOE gap with evidence, an owner and a due date. Assign engineering the integration tests, quality the reference decisions, and the sponsor the resources.
Agree defect-specific limits, test coverage and response rules before the run. Record the existing inspection baseline under comparable conditions, then review AI errors, inspection time and unresolved incidents. A faster cycle alone cannot justify expansion if critical defects remain insufficiently tested.
To judge whether the proposed approach helps, also track overdue gaps, unresolved disagreements and responses to changes. Improvements would support the local pilot decision; without a suitable comparison, they would not isolate TOE’s causal contribution. Jöhnk and colleagues’ interview research supports recurring, purpose-specific readiness assessment, while calling for further validation. [3]
Trace one change: the supplier updates the model
The supplier notice identifies the changed version. Engineering checks affected interfaces and reruns relevant evaluation. Quality reviews errors against the agreed reference and criteria; operators receive any revised instructions. The authorized owner approves continued use, restricts the scope or retains the earlier configuration. Link the notice, tests, decision and training evidence in one change record.
The practical takeaway
Apply TOE to the next decision
For this factory, applying TOE means aligning technology, organizational capability and external conditions before scaling. Turn relevant gaps into owned actions, verify them together in a supervised pilot, and revisit readiness when conditions change. The review provides a useful foundation; the team must still produce evidence that supports its own operating decision.
Sources
- Hirtranusi, S. A., Ranti, B., Nugroho, W. S., & Jatmiko, W. (2026). A Systematic Literature Review on Organizational Readiness for Artificial Intelligence Adoption Based on the TOE Framework. International Journal of Advanced Computer Science and Applications, 17(1), 491–503. Tables III–V; Figure 5; Sections IV–V.
- Baker, J. (2012). The Technology–Organization–Environment Framework. In Information Systems Theory, 231–245. Springer. Original framework attributed to Tornatzky, L. G., & Fleischer, M. (1990), The Processes of Technological Innovation, Lexington Books.
- Jöhnk, J., Weißert, M., & Wyrtki, K. (2021). Ready or Not, AI Comes—An Interview Study of Organizational AI Readiness Factors. Business & Information Systems Engineering, 63, 5–20. Sections 4.5–4.6 and 5.1–5.3.
- Google for Developers. Classification: Accuracy, recall, precision, and related metrics. Machine Learning Crash Course.
- Google for Developers. Datasets: Dividing the original dataset. Machine Learning Crash Course.
Wanna know more? Let's dive in!
The Next-Gen SQA Engineer: Navigating Component-Based and Microservice Systems
GOOD: Developing programming competencies within the quality team. BETTER: Transforming traditional quality engineers into Software Quality Assurance Engineers who understand microservices architecture.
From Single ECU Flashing to Fleet-Wide OTA Software Lifecycle Management
GOOD: Managing ECU software versions. BETTER: Handling mass Over-the-Air (OTA) updates while maintaining vehicle configuration integrity and compliance with type-approval regulations.Managing ECU software versions has evolved from a routine workshop maintenance task...
When Software Sprints Hit Hardware Reality: Mastering Lifecycle Synchronization in ASPICE
GOOD: Implementing Automotive SPICE for embedded systems / software. BETTER: Synchronizing the software lifecycle with the traditional hardware lifecycle.Implementing ASPICE for embedded software gives you the process discipline needed to write reliable automotive...
Can Agile Teams Actually Achieve ASPICE Level 3 and ISO 26262 Compliance
GOOD: Achieving ASPICE Maturity Level 2 in automotive software development processes. BETTER: Scaling processes to ASPICE Level 3 within distributed, multicultural Agile teams while simultaneously meeting the rigorous requirements of ISO 26262 (Functional...
Stop Just Rating Your Suppliers Start Developing Them
GOOD: Rating Your Suppliers on Excel BETTER: Implementation of a supplier development program based on process, product, and system audits.A quarterly Excel scorecard might satisfy an ISO auditor that you are monitoring your supply chain, but it won't stop a bad part...
Qualified Doesn’t Mean Safe: Why Your Special Processes Need Real-Time Parameter Lockouts
GOOD: Qualification of special processes (e.g., welding, heat treatment). BETTER: Continuous digital monitoring of critical special process parameters, with automatic blocking of batch shipment in the event of micro-deviations.Qualifying a special process once a year...
The Evolution of Process Quality: Integrating Control Plans with Self-Learning AI-PFMEA
GOOD: Planowanie kontroli jakości wyrobu (Plan Kontroli / Control Plan). BETTER: Integracja Planu Kontroli w czasie rzeczywistym z dynamiczną, samouczącą się FMEA procesową (AI-driven dynamic PFMEA).A Control Plan shouldn't be an administrative task you finish just to...
From Local Complaint Handling to Global Containment Scaling 8D with 24-Hour Automated Read-Across
GOOD: Handling external customer complaints (8D report) BETTER: Implementing the read-across principle (cascading corrective actions to 100% of identical production lines worldwide within 24 hours of error detection).In modern global manufacturing, resolving a...
From Manual MSA Studies to Autonomous Quality Control Leveraging Machine Learning for Dynamic In-Line Gauging
GOOD: Analiza Systemów Pomiarowych MSA (Measurement System Analysis). BETTER: Prowadzenie dynamicznego MSA dla systemów pomiarowych wbudowanych w linie robocze (in-line gauging) zautomatyzowane ML lub AI.Relying on annual calibration stickers and static, one-time MSA...
Mitigating Sub-Tier Supply Risk: Moving from Classic QMS Audits to Automated VDA N+2 Escalation
GOOD: Conducting standard internal quality management system audits. BETTER: Creating audit program, including process audits (VDA 6.3) and product audits (VDA 6.5) at N+2 tier suppliers, incorporating immediate digital escalation.The purpose of auditing is not to...
From Static Process Maps to Live COPQ & Real-Time OEE: Upgrading Your QMS
GOOD: Implementing a standard process approach compliant with ISO 9001. BETTER: Fully integrating IATF 16949 and VDA 6.4 requirements with current Cost of Poor Quality (COPQ) and automated, real-time OEE monitoring.Building a more responsive QMS is not about...
The G-Force of Growth
Artificial Intelligence (AI) is reshaping industries, but its success depends on more than just advanced algorithms. Without structured processes, AI systems risk being unreliable, biased, or unsafe. We explore the MMSIA framework, a new AI maturity model based on...










