AI adoption · Organizational readiness
How to apply TOE when adopting AI
A convincing artificial intelligence demonstration can still leave a factory unprepared for production. Use Technology–Organization–Environment to turn an inspection idea into evidence, responsibilities and a controlled pilot.
The factory needs more than a working demo
Consider the same illustrative factory as the video: camera-based AI helps inspectors find cracks in metal parts. Engineering integrates the system, quality defines defect and acceptance criteria, operators use the results, and a supplier maintains the model. The intended benefit is faster inspection, with people retaining release decisions.
The demonstration may use clear images and familiar defects. Production adds changing lighting, different shifts and rare cracks. An image collection can be complete against a collection plan yet still omit an important operating condition. Available data therefore needs a suitability check before it becomes credible test evidence.
Responsibility creates another failure mechanism. If the AI and inspector disagree, who verifies the reference decision, contains the issue and authorizes continued use? A model purchase cannot settle those questions. Neither can good test results compensate for an undefined response.
Read the study as a map of readiness
Hirtranusi and colleagues report a systematic review of 40 journal articles. They used open, axial and selective coding: extract readiness statements, group related concepts, then consolidate broader themes. Their synthesis identifies 12 themes, four within each TOE dimension. [1]
The contribution is a structured account of interacting conditions. Data and infrastructure depend on organizational resources and governance; supplier and institutional conditions shape what the organization can sustain. The authors propose this synthesis as a foundation for future readiness assessments. They do not validate a universal scoring instrument or test our factory workflow.
What do the coding counts and limitations mean?
The reported 124 initial codes include four meta-level codes excluded from readiness classification. The remaining 120 TOE codes were consolidated into 35 categories and 12 themes. These are synthesis units, not success rates.
The review covers English-language Scopus journal literature with heterogeneous readiness definitions. It does not establish post-adoption value. Included-study years and filtering stages are described inconsistently, so those details should not support precise trend claims. Its cross-dimensional relationships are a conceptual synthesis, not causal effects measured in a new experiment.
Turn TOE into evidence and ownership
The Technology–Organization–Environment framework, attributed to Tornatzky and Fleischer (1990), examines three adoption contexts. Environment means external business and institutional conditions. Its three contexts guide the proposed inspection pilot below; the workflow is an application of TOE, rather than an official process sequence. [2]
Ask what must be true in each context, what evidence would demonstrate it, and who owns the gap. Open each perspective to examine the practical action.
TechnologyCan we trust the test and the connection?
Quality verifies defect labels; engineering tests production images held out from training. Include rare defects, lighting changes and the intended operating range. Keep duplicate images out of the final test, and avoid repeatedly tuning against it. [5]
Check that each result reaches the correct part record in time. Evidence includes a versioned dataset, reference-label review and integration results. This applies the paper’s Data & Analytics Readiness and System Capability themes.
OrganizationWho owns a disagreement?
Quality names an accountable inspection owner. The sponsor allocates testing and training time. Operators practise escalation and record both the AI suggestion and the verified inspection outcome.
Evidence includes the decision rule, training records and an exercised response to disagreements. This applies Strategic & Managerial Support, Human & Structural Readiness, and Cultural & Governance Alignment. Human release authority remains explicit.
EnvironmentWhich external conditions must hold?
The project manager confirms supplier support, model-version information and advance update notices. Quality agrees customer acceptance requirements and identifies applicable obligations with the responsible specialists.
Evidence includes support arrangements, change notices and agreed criteria. This applies Collaborative Ecosystem and Regulatory & Policy Context. Receiving a supplier document alone does not demonstrate that its requirements have been met.
Connect the checks before deciding to scale
The contexts meet in one supervised pilot. A trained operator needs useful model output; a trustworthy comparison needs verified reference inspections; and a model update needs an agreed review route. This proposed loop makes those dependencies visible.
Measure behaviour, not checklist completion
Compare model classifications with reference inspections whose disagreements have been resolved. Track missed defects, false rejects and inspection time against criteria agreed before testing. Here, a “false reject” means an acceptable part flagged by AI; an inspector may still release it. These counts do not directly measure escaped defects or actual scrap.
Use the correct denominator: missed defective parts divided by reference-defective parts; falsely flagged acceptable parts divided by reference-acceptable parts. Overall accuracy uses all classified parts. [4]
Try the inspection example
What does a high accuracy figure hide?
These invented counts illustrate the measures. They are not study results or a readiness score.
With 20 defective parts, two misses, 1,000 acceptable parts and ten false flags: missed-defect rate is 10.0%, false-reject rate is 1.0%, and overall accuracy is 98.8%.
Change the whole-number counts. All reference labels are assumed verified.
The illustration misses 2 of 20 defective parts despite 98.8% overall accuracy.
A sample with no defective parts cannot estimate the missed-defect rate. Even an observed zero needs adequate coverage and uncertainty assessment before a deployment decision.
Start with one part family on one line
Define the pilot boundary, operating conditions, model version and human release authority. Record each TOE gap with evidence, an owner and a due date. Assign engineering the integration tests, quality the reference decisions, and the sponsor the resources.
Agree defect-specific limits, test coverage and response rules before the run. Record the existing inspection baseline under comparable conditions, then review AI errors, inspection time and unresolved incidents. A faster cycle alone cannot justify expansion if critical defects remain insufficiently tested.
To judge whether the proposed approach helps, also track overdue gaps, unresolved disagreements and responses to changes. Improvements would support the local pilot decision; without a suitable comparison, they would not isolate TOE’s causal contribution. Jöhnk and colleagues’ interview research supports recurring, purpose-specific readiness assessment, while calling for further validation. [3]
Trace one change: the supplier updates the model
The supplier notice identifies the changed version. Engineering checks affected interfaces and reruns relevant evaluation. Quality reviews errors against the agreed reference and criteria; operators receive any revised instructions. The authorized owner approves continued use, restricts the scope or retains the earlier configuration. Link the notice, tests, decision and training evidence in one change record.
The practical takeaway
Apply TOE to the next decision
For this factory, applying TOE means aligning technology, organizational capability and external conditions before scaling. Turn relevant gaps into owned actions, verify them together in a supervised pilot, and revisit readiness when conditions change. The review provides a useful foundation; the team must still produce evidence that supports its own operating decision.
Sources
- Hirtranusi, S. A., Ranti, B., Nugroho, W. S., & Jatmiko, W. (2026). A Systematic Literature Review on Organizational Readiness for Artificial Intelligence Adoption Based on the TOE Framework. International Journal of Advanced Computer Science and Applications, 17(1), 491–503. Tables III–V; Figure 5; Sections IV–V.
- Baker, J. (2012). The Technology–Organization–Environment Framework. In Information Systems Theory, 231–245. Springer. Original framework attributed to Tornatzky, L. G., & Fleischer, M. (1990), The Processes of Technological Innovation, Lexington Books.
- Jöhnk, J., Weißert, M., & Wyrtki, K. (2021). Ready or Not, AI Comes—An Interview Study of Organizational AI Readiness Factors. Business & Information Systems Engineering, 63, 5–20. Sections 4.5–4.6 and 5.1–5.3.
- Google for Developers. Classification: Accuracy, recall, precision, and related metrics. Machine Learning Crash Course.
- Google for Developers. Datasets: Dividing the original dataset. Machine Learning Crash Course.
Wanna know more? Let's dive in!
Traditional IT deployment models fail with AI
AI adoption · Data readiness Before launching AI, audit your data A working model does not tell you whether your organisation’s data is ready for it. Using a building-energy example, examine accuracy, privacy, accessibility and bias before a pilot, then turn the...
Organizational AI Readiness
Organizational AI Readiness · Research into practice Is Your Organization Ready to Implement AI? A convincing artificial intelligence (AI) demo is a start. Putting it to work also depends on people, processes, resources and usable data. An interview study offers a way...
A ship must meet ice-class rules.
Systems engineering · Requirements · Verification Can Automotive SPICE help with ship design? Changing regulations. Data from multiple suppliers. A model with information still missing. Using ice-class rules as a case study, I explore how to connect requirements,...
Beyond the Laminated Poster: Why Quality Policies Fail
GOOD: Maintaining a basic ISO 9001 Quality Policy. BETTER: Building a resilient, high-accountability Quality Culture using ISO 10010 guidance.A documented Quality Policy is a necessary administrative milestone, but a piece of paper cannot stop a defective component...
Why Meeting Basic ISO 9001 Isn’t Enough
GOOD: Meeting basic ISO 9001 compliance requirements BETTER: Integrating core quality tools guided by ISO 10009 guidelines for quality tools and their selection.An ISO 9001 certificate proves that an organization has structured processes in place, but it does not...
How to Master ASPICE Configuration Management and ISO 10007
GOOD: Standard ISO 9001 document and documented information control. BETTER: Mastering ASPICE SUP.8 Configuration Management and ISO 10007 Configuration Management guidelines.Controlling documents is an essential foundational requirement of any quality management...
Beyond the Checklist: How to Integrate the V-Model, ASPICE SUP.1, and ISO 10006
GOOD: High-level PRINCE2 project quality management. BETTER: Engineering rigor via the V-Model lifecycle, ASPICE SUP.1 Quality Assurance, and ISO 10006 quality management in projects.High-level project management frameworks like PRINCE2 provide essential...
The Static Document Fallacy
GOOD: Eelying on static project scope documents, product drawings, and service specs. BETTER: Deploying a proper Requirements Management System with bidirectional traceability and a Quality Plan fully consistent with ISO 10005.Product drawings, scope sheets, and...
The NPS Mirage: Why Annual Surveys Miss the Mark
GOOD: Measuring satisfaction through periodic surveys and static NPS scores. BETTER: Building a dynamic, ongoing system to capture 100% of unstructured written and verbal customer feedback across all employee touchpoints.Relying on annual NPS surveys to gauge customer...
Why Global Innovation Fails in Multi-Plant Manufacturing And How to Build an Automated, ROI-Driven Transfer Matrix
GOOD: Sharing best practices across the corporation’s various facilities (Best Practice Sharing). BETTER: A global matrix for transferring process innovations, with automated tracking of savings (Kaizen/Six Sigma ROI) at the corporate level.Sharing best practices on...
Why Documenting Risk Actions Is Not Enough And How to Automate Mitigation Tracking with KPIs and KRIs
GOOD: Documenting risk-mitigation activities. BETTER: Automatically tracking the effectiveness of implemented mitigation measures using KPIs and KRIs (Key Risk Indicators).Documenting risk mitigation actions is an essential starting point, but treating documentation...
Moving Beyond Tech Risk Audits to AI Ethics, Legal Compliance, and Machine Learning Accountability
GOOD: Risk assessment for the implementation of new technologies (e.g., AI, IoT). BETTER: Ethical and legal risk assessment (AI Ethics & Compliance) when deploying machine learning models within quality-related decision-making processes.Deploying Machine Learning...